• Who We Are
    • Our History
    • About TIW
    • Health, Safety & Environmental
    • Quality Standards & Practices
    • MBB Power Services Division
    • Engineered Structures for Industry
    • Field Erected Tank Construction
    • Photo Galleries
    • Success Stories
  • Services
    • Tank Maintenance and Repair
    • Turnaround Projects & Maintenance Events
    • Direct Fired Heaters Repair and Installation
    • Boiler & Heater Services
    • HRSG Services
    • OTSG Services
    • ASME Pressure Vessel Repairs & Alterations
    • Pressure Vessel Supply & Construction
    • Large-Scale Multi-Tank Projects
  • Products
    • API 650 Tanks, Various Configurations
    • Low-Temp & Cryogenic Storage
    • Storage Spheres
    • Welded Bulk Storage Silos, Bins & Hoppers
    • Aboveground Water Storage Tanks
    • Hot Lime Softeners
    • Misc. Fabrication & Field Erection
  • Industries Served
    • Storage Terminals & Pipelines
    • Petrochemical / Refining
    • Oil Sands & SAGD Projects
    • Power & Hydro Electric
    • Mining, Minerals & Metals
    • Pulp / Paper & Forestry
    • Chemical
    • Alternative Renewable Fuels
    • Aviation Fuel Tanks
    • Ind. Water Supply & Fire Protection
    • Wastewater & Biological Treatment
    • Liquid Gas & Cryogenic Storage
    • Food & Beverage Processing
  • Photo Galleries
  • Employment
  • What’s New
  • COVID-19
  • Contact TIW
TIW Steel Platework Inc.
1-888-853-4347
  • What’s New
  • Employment
  • LinkedIn

MENUMENU
  • Who We Are
    • About TIW
      • Our History
      • Company Overview
      • Mission & Core Values
      • Success Stories
    • Health, Safety & Environmental
      • Our Philosophy & Policy
      • Ongoing Environmental Commitment
      • Certifications & Memberships
      • COVID-19
    • Quality Standards & Practices
      • Our Quality Policy
      • Quality Assurance / Control
      • Quality Management System
    • Service Delivery
      • Engineered Structures for Industry
      • MBB Power Services
      • Field Erected Tank Construction
  • Products & Services
    • Repair & Maint. - Boilers, Fired Heaters & Furnaces
      • Boiler & Heater Services
      • Direct Fired Heaters Repair and Installation
      • HRSG Services
      • OTSG Services
    • Field Erected Storage Projects
      • API 650 Tanks, Various Configurations
      • API 620, Low Temp & Cryogenic Storage
      • Aboveground Flat Bottom Water Storage Tanks
      • Large-Scale Multi-Tank Projects
    • ASME Field Erected Pressure Vessels
      • Storage Spheres
      • Hot Lime Softeners
      • Pressure Vessel Supply & Construction
    • Repair & Maint. - Tank & Vessel Services
      • API 653 Tank Maintenance & Repairs
      • ASME Pressure Vessel Repairs & Alterations
    • Welded Bulk Storage Silos, Bins & Hoppers
      • Welded Bulk Storage Silos, Bins & Hoppers
    • Turnaround Maintenance Events
      • Turnaround Projects & Maintenance Events
  • Industries Served
    • Storage Terminals & Pipelines
    • Petrochemical / Refining
    • Oil Sands & SAGD Projects
    • Power & Hydro Electric
    • Mining, Minerals & Metals
    • Pulp / Paper & Forestry
    • Chemical
    • Alternative Renewable Fuels
    • Aviation Fuel Tanks
    • Ind. Water Supply & Fire Protection
    • Wastewater & Biological Treatment
    • Liquid Gas & Cryogenic Storage
    • Food & Beverage Processing
  • Galleries
  • Contact TIW


Search

Turnaround Maintenance Events

  • Select a Gallery
    • API 650 Tanks
    • Large-Scale Multi-Tank Projects
    • Low Temp & Cryogenic Tanks
    • Water Tanks
    • Silos, Bins & Hoppers
    • Storage Spheres
    • Hot Lime Softeners
    • Turnaround Maintenance Events
    • API & ASME Repair & Maintenance Services
    • Penstocks
    • Field Erected Pressure Vessels

Turnarounds

The success of a turnaround project depends on how effectively it’s managed, from the planning stage to the final turnover. TIW’s highly qualified and experienced project managers and schedulers bring years of practical field experience. From managing multiple subcontractors to finding creative solutions in complex environments, our leadership will always maintain the critical path of the turnaround schedule.

Heat Exchanger Bundle being taken to the Cleaning Pad
Erecting New Regen Plenum Head
Removal of old Regen Head
Regen Cyclone Assembly
Carefully Planned, Precision Work
Preparing for Lifting of new Regen Head
Assembly of new Reactor and Regenerator Heads
Pre-Turnaound Assembly
FCCU Heads Off Pre-Turnaround. New Reactor Head and Cyclone Assembly (Bottom Right)
Your Turnaround Heads Off Specialists
Lift of New Section of FCCU, Reactor Head and Cyclone Assembly
Installing New Regenerator Head over Internals
Carefully Planned Precision Work
Hoarding to Maintain Temperature for Installing the Refractory Inside the Head and Shell Body of the Reactor and Regenerator.
Preparing Hoarding to cover Reactor Head and Cyclone Assembly
New Regen Head and Cyclone Assembly
Replacing the Bottom of the Reactor Stripper
Heater Tube Replacement
New Reactor Head
Erecting New Regen Plenum
New Regen Head
Lift of Reactor Plenum Section
Lift of New Section of FCCU, Reactor Head and Cyclone Assembly
New Reactor Head and Cyclone Assembly
Removal of Existing Reactor Head
Replacement Convection Section of a Crude Heater
Turnkey Solutions
Construction of New Reactor and Regenerator Heads and Cyclone Assemblies
Temporary Structure for the New Head and Cyclone Assemblies of the Reactor and Regenerator
Replacement Flare Stack
Replacement 320 Foot Flare Stack at Grade
Erection at Grade
Erection of a Replacement 320 Foot Flare Stack at Grade
Cost Effective Procedures
Removal of an Existing 320 Foot Flare Stack at Grade
Head & Cyclone Assembly
New Reactor and Regenerator Head and-Cyclone Assembly
Regenerator New Head-Assembly
Regenerator Installation of the Bottom Plenum Skirt on top of the Cyclone Assembly
Raising Pair of Primary & Secondary Cyclones a to Temporary Structure for Assembly
Industry Expertise
Setting the Reactor Pair of Cyclones into Position on a Temporary Structure
Reactor Cyclone Assembly
Surrounding Platform to Weld the Bottom Plenum Skirt Bracing.
Replacement Top Section of Stripper Tower
Crane Lift of Stripper-Tower into Upright Position to be Installed
Hoisting Burner Top of Replacement Flare Stack to Position
Removal of the Old Reactor Head and Cyclone
Creating a Safe & Efficient Workplace
Temporary Access Staircase for the Rengenerator and Reactor Head and Cyclone Replacements
Assembly of the Regenerator New Head and Shell Body and the Test Head
Internal Riser of Refinery Reactor Vessel Ready for Shipment
Internal Riser of Refinery Reactor Vessel Ready for Shipment
Internal Riser of Refinery Reactor Vessel Ready for Shipment
tel: (905) 684-9421 fax: (905) 684-7310

© Copyright 2025 TIW Steel Platework Inc.. All Rights Reserved.